New/Existing Customers  |  About Us  |  Employment  |  Contact Us  |  Home 

601 South 2nd Street P.O. Box 338 Rogers, Arkansas 72757
(479) 621-1142

Email us here

  Engineering/Planning
 
Log Out of Account

In order to assist developers, engineering consultants, contractors, and planners as they prepare projects for evaluation by the RWU engineering staff, we are now providing details, guidelines, and specifications for download.  As revisions, additions, and changes are made, the documents are updated on this website, and the revision and effective date are given for each document.

Your Rogers Water Utilities Engineering contact will inform you of the documents that apply to your project.  Please download them and familiarize yourself with their contents.  Many common questions are answered in these documents.  As always, if you have further questions, your Rogers Water Utilities Engineering department will be pleased to help.

Current Notices:
(Click HERE for aged notices)

The following sections are hereby revised in the Standard Specifications For Construction of Public Water and Sewer Improvements in the City of Rogers and Areas Under the Jurisdiction of Rogers Waterworks and Sewer Commission, dated August 1996, revised April 16, 1997.  All other sections of the said standard specifications remain in effect.

Resolutions and Legal Notices:

Resolution 05-05 and Resolution 03-07 Regarding Water / Sewer access and hookup fees - PDF
Resolution 05-05 Approved November 2004, Resolution 03-07 Approved September 2006, Access Fees effective April 01, 2005, Hookup Fees effective April 01, 2006

Resolution 06-202 Regarding New Sewer rate schedule - PDF
Resolution 06-202 Approved December 2006, first Sewer Rates increase effective February 01, 2007, second increase effective February 1, 2008

Supporting Maps for Rates, Assessments, etc.:

Special Assessment Area Location Maps - PDF

Forms, Agreements, and Other Documents:

Easement Document - DOC
Posted January 21, 2013

Cost Certification Forms - PDF
Posted January 21, 2013

RWU Bond Requirements - PDF
Posted April 04, 2007

Engineering Guidelines:

Rogers Water Utilities Plan Preparation Guideline Checklist - PDF
Effective December 12, 2005

Commercial Cross Connection Control & Fire Prevention System Guideline Checklist - PDF
Effective February 1, 2006

Rogers Water Utilities Service Meter Sizing Information - PDF
Effective Feb 21, 2007

Rogers Water Utilities Inspection Checklists:

RWU Water System Inspection Acceptance Checklist - PDF
Effective February 1, 2006

RWU Sewer System Inspection Acceptance Checklist - PDF
Effective February 1, 2006

Rogers Water Pollution Control Facility Documents:

Rogers Pollution Control Grease and Sand/Oil/Water Interceptor Questionnaire - PDF
Effective May 8, 2006

Rogers Pollution Control Grease Interceptor Sizing Worksheet - XLS
Effective May 8, 2006

Grease Interceptor Configuration Drawing - PDF
Effective September 15, 2006

Kitchen Plumbing Directive - Food Service - PDF
Effective June 25, 2008

Solids Interceptor Directive - Food Service - PDF
Effective June 25, 2008

Drawings

(Right-click on link and click "save link as" or "save target as" to download and view drawings)

Rogers Water Utilities Standard Water Details 1:

ACAD - DWG file
ADOBE - PDF file

Revised August 2007

Rogers Water Utilities Standard Water Details 2:

ACAD - DWG file
ADOBE - PDF file

Revised January 2008

Rogers Water Utilities Standard Sewer Details 1:

ACAD - DWG file
ADOBE - PDF file

Revised May 2012

Elevator Sump w/Barrel Containment Drawing:

ACAD - DWG file
ADOBE - PDF file
DXF file
DWF file

Effective December 2006

Specifications

Water Line Material Specifications:

Spec# Applies to (Click below to view specification)           Revised
02-01 Ductile Iron Pipe 12/12/2006
02-02 Fittings 12/01/2005
02-03 Gate Valves 12/01/2005
02-04 Butterfly Valves 12/01/2005
02-05 Air Release Valves 12/01/2005
02-06 Fire Hydrants 08/21/2006
02-07 Tapping Sleeves, Tapping Valves, Insert & Cut-in Valves 12/01/2005
02-08 Joint Restraint Systems 03/06/2006
02-09 Valve Boxes 12/01/2005
02-10 Meter Boxes 06/12/2006
02-11 Meter Service Hardware 08/21/2006
02-12 Copper Tubing 02/01/2006
02-13 1 1/2 & 2 inch Meter Service Hardware and Meter Boxes 12/12/2006
02-14 Repair Clamps 12/01/2005
02-15 Repair Couplings 12/01/2005
02-16 In Building Stainless Steel Fire Line Riser 08/20/2007

Sewer Line Material Specifications:

Spec# Applies to (Click below to view specification)           Revised
03-01 Gravity PVC Sewer Pipe 03/06/2006
03-02 Gravity DI Sewer Pipe 12/01/2005
03-03 Sewer Force Main 12/01/2005
03-04 Cast Iron Manhole Frames and Covers 06/12/2006
03-05 Gravity Sewer Miscellaneous 12/01/2005
03-06 Plug Valves 12/01/2005
03-07 Check Valves 12/01/2005
03-08 Air / Vacuum Valves 12/01/2005
03-09 Force Main Miscellaneous 12/01/2005
03-10 Service Saddles, Repair Couplings & Clamps 12/01/2005
03-11 Protective Manhole Coatings & Wet Well Liners 12/01/2005

Water / Sewer Line Material Specifications:

Spec# Applies to (Click below to view specification)           Revised
04-01 Casing Spacers 12/01/2005
04-02 Steel Casing 12/01/2005
04-03 Pipe Bedding Materials 03/06/2006
04-04 Granular Backfill Materials 06/12/2006
04-05 Engineering Select Backfill Materials 06/12/2006
04-06 Flowable Fill Materials 06/12/2006
04-07 Concrete 08/21/2006
04-08 Reinforcing Steel 06/12/2006
04-09 Joint Sealant 08/21/2006
04-10 Asphalt Concrete Cold Plant Mix Material 08/20/2007

Water Line Construction Specifications:

Spec# Applies to (Click below to view specification)           Revised
05-01 Pending  
05-02 Pending  
05-03 Directional Bore 08/21/2006

Sewer Line Construction Specifications:

Spec# Applies to (Click below to view specification)           Revised
06-01 Pending  
06-02 Sanitary Sewer Manhole Construction 12/12/2006
06-03 Pending  
06-04 Sanitary Sewer Manhole Adjustments 08/21/2006

Sewer Line Construction Specifications:

Spec# Applies to (Click below to view specification)           Revised
07-01 Excavation / Trenching 12/12/2006
07-02 Auger Jack and Bore 08/21/2006
07-03 Pipe Embedment 12/12/2006
07-04 Excavation / Trench Backfill 12/12/2006
07-05 Tap Sleeves and Valves 08/20/2007
07-06 Concrete Thrust Blocking 08/20/2007

Water / Sewer Line Testing:

Spec# Applies to (Click below to view specification)           Revised
08-01 Pending  
08-02 Sanitary Sewer Manhole Testing 02/01/2006
08-03 Sanitary Sewer Main Low Pressure Air Testing 03/02/2006
08-04 Sanitary Sewer Main TV Inspection 02/01/2006
08-05 Sanitary Sewer Wet Well Testing 02/01/2006
08-06 Sanitary Sewer Main Hydrostatic Test 05/01/2006
08-07 Water Main Hydrostatic Test 05/01/2006
08-08 Water Main Disinfection 05/01/2006
08-09 Record Plan 01/21/2013

Arkansas Department of Health and Human Services

2012 Annual Drinking Water Quality Report
2011 Annual Drinking Water Quality Report
2010 Annual Drinking Water Quality Report
2009 Annual Drinking Water Quality Report
2008 Annual Drinking Water Quality Report

Water Bacteriological Testing Results


All backflow assemblies including commercial, industrial and irrigation systems should be tested annually and reported to Rogers Water Utilities.  All testing should be administered by a licensed backflow technician.  If you have any questions please feel free to contact us.  For a list of licensed technicians, click the following link:

Backflow Assembly Testing and Repair




Login to Your Account | Current Rates | Automatic Draft | Customer FAQ | Help 2 Others Project
About Us | At a Glance | Mission Statement | Our History | Policies | Engineering/Planning
Conservation | Winterization Tips | Rogers Pollution Control Facility | RWU Laboratory
Drug/Hazardous Waste Disposal | Stop the Grease! | Pretreatment Program | Employment
Contact Us | Home

© 2011 Rogers Water Utilities

Another DesignWorks Creation!