Development Standards and Guidelines

Develop With Rogers Water Utilities

Engineering Plan Development Guidelines
Schedule a Pre-Design meeting with us by sending an emailing to field@rogersar.gov with the property location in the request. The typical project is submitted to the City of Rogers first. After the first review, plans are submitted to RWU directly. Starting on the fourth review and beyond a review fee may apply. See the policy here. All sets of plans will be reviewed by RWU staff for adherence to our Plan Review Checklist. Once all comments have been corrected the plans will be approved for construction. All plans with off-site water and/or sewer main extensions must provide an easement for the new water/sewer main, assuming one does not exist. This easement must be approved by RWU before it is filled. Click Here for a sample easement document. Click here for Plan Review Checklist
Design Standards
RWU Standard Design Details

The Standard Design Detail must be included in every set of plans that includes a water and/or sewer main extension below are downloads for a PDF and DWG version of the detail sheets.

Standard Water & Sewer Details Sheets

Water Detail Sheet One

Water Detail Sheet Two

Sewer Detail Sheet One

Combined Detail Sheets

RWU Standard Specifications

Standard Specifications is a list of all the specifications for Materials, Construction Procedures, Testing, Project Cleanup, and many other General Requirements. All RWU Standard Specifications must be followed.

RWU Standard Specification

Meter Sizing

The following chart is intended to be a general guide for meter capacities based on demand.

Meter Sizing Chart

Fees
New services (Water and Sewer) may require a fee to be paid before the service can be established. The current Resolution for the fees can be found by clicking here.

Access and Development Fees

Construction Inspection
Daily construction inspection is required by the engineer of record on all projects that extend or improve RWU facilities. Guidelines for construction inspection is outlined in the following document: RWU Inspection Guidelines

Standard Inspection Forms

Water Acceptance Form

Sewer Acceptance Form

Project Closeout Checklist

Customer Care

Call: 479-621-1142
Fax:  479-621-1146
Email: service@rogersar.gov

Physical Address:
Rogers Water Utilities
601 S 2nd Street
Rogers, Arkansas 72756
Mailing Address:
Rogers Water Utilities
P.O. Box 338
Rogers, Arkansas 72757

Still Have Questions?