Current Solicitations and Bid Tabulations
Notice
Current Solicitations
- 01/19/2023 Invitation For Bid - Certificate of Deposit Placement
The Rogers Water Utilities (RWU) of Rogers, Arkansas is inviting submissions from qualified banks and banking institutions (“banks”) for compilation of a bid list for Certificate of Deposit (CD) placement. Banks meeting the requirements in the Invitation for Bid (IFB), will, subject to the terms and conditions of the IFB, be placed on RWU’s bid list to be notified of opportunities to bid on CD Placement. Bid opening will be conducted via virtual meeting Time: February 15th, 2023 1:00 PMMicrosoft Teams meeting
Click here to join the meeting Meeting ID: 271 337 620 925 Passcode: Mwhi9N - 01/15/2023 2023 Large Diameter Sewer Rehab
The project consists of installation of approximately 1150 linear feet of 30” sewer main, 920 linear feet of 24” sewer main, and a point repair on 21” VCP sewer main. Related Materials: Plans Bid Form Addendum as of February 2nd, 2023 - 01/13/2023 RWU Materials Storage Improvements
The project consists of the construction of a gravel storage area, asphalt drives, site lighting, cast-in-place gravel storage bins, and associated earthwork and electrical work. The total disturbed area is less than 1 acre.
All necessary work, materials and every item of construction shall be in accordance with the plans and contract documents developed by Rogers Water Utilities. Contract documents and bid forms are available for download online at https://www.rwu.org/developers-and-contractors/bids-contracts/ or at https://www.centralbidding.com. Contact the Utility office at (479) 936-5426 or email briansartain@rwu.org with any questions. The contractors shall make such inspection and studies of the work site necessary to familiarize themselves with all conditions to be encountered.
Bids will be publicly opened and read aloud in the Utility Office at 601 South 2nd Street, Rogers, Arkansas, at 2:00 p.m. local time on Tuesday, February 14th.
Related Materials: Plans Contract
Bid Tabulations
- 10/20/2022 Mills Sewer Extension, JB Hunt Waterline Replacement, and S. 2nd St. / W. Pine St. Water and Sewer Main Replacement
- 09/13/2022 Banz Area Sewer Main Replacement
Banz Area Sewer Main Replacement: The project consists of installation of approximately 10,715 linear feet of 8” sewer main throughout an existing subdivision. - 04/14/2022 Sewer Maintenance Contract 2022
- 03/18/2022 Chestnut Sewer and Water
- 12/20/2021 Rogers Pollution Control - Polymer Handling
Bid Tabulation for Invitation to Bid: Polymer Handling - 11/12/2021 Cleaning, Repairing, & Painting 2,000,000-Gallon Elevated Reservoir
- 09/03/2021 Highway I-49 18” Water Main Extension
- 06/21/2021 RWU 2021 Janitorial Services Bid
- 04/23/2021 2021 RWU Water Line Replacement